Charging
ABB
120 and 180 kW fast-charge station
120 and 180 kW fast-charge station
Details
How long does charging usually take?
- 20 to 30 minutes.
Where can I find this type of charging?
- Along main roads.
When would I use this type of charging?
- When you’re on the road, during stops before you reach your final destination.
- To top up your battery when you’re on the go.
To have access to a charging station in a parking facility that charges fees, parking fees must be paid as they are not included in the charging cost.
Some 120 and 180 kW charging stations enable power sharging, which allows two vehicles to simultaneously charge at the same station.
Instructions
Use it in 4 steps:
1) Turn off your EV. On the welcome screen, start by selecting the connector that is compatible with your EV.
2) Lift the connector and plug it into your EV.
3) Wait for the charging station to establish communication with your EV.
4) Wait for the charging station to establish communication with your EV.
1) Follow the on-screen instructions to sign in with the mobile app or your Electric Circuit card.
2) If you use the "Electric Circuit" application. On the touch screen, press "Application" Follow the instructions in the mobile application and choose a CEXX-XXXXX terminal, then press "Start".
1) If you are using the Electric Circuit card, on the touch screen, press "Start". If you are using the "Electric Circuit" application. Follow the instructions in the app and start your recharge. Charging will then begin.
2) The station readies and then starts the charging session. The charging station’s screen will display the charging progress.
1) When you want to stop charging, tap the Stop button on the screen. Charging will automatically stop when the EV indicates its battery is full .
2) Warning: Emergency stop button Do not use the emergency stop button to stop charging unless there is an imminent danger.
Stations and pricing
Only all-electric vehicles with a CHAdeMO or Combo socket can be charged at 120-180 kW fast-charge station.