Charging
ADD
100 kW fast-charge station
100 kW fast-charge station
Details
How long does charging usually take?
- 25 to 30 minutes.
Where can I find this type of charging?
- Along main roads.
When would I use this type of charging?
- When you’re on the road, during stops before you reach your final destination.
- To top up your battery when you’re on the go.
To have access to a charging station in a parking facility that charges fees, parking fees must be paid as they are not included in the charging cost.
Instructions
Use it in 4 steps:
Hold your Electric Circuit card in front of the scanner. Instructions will be displayed on the screen. Once the authentication is complete, the door will unlock.
Plug the compatible charging connector to your vehicle.* *CHAdeMO connector: available on asian EV and Tesla (adapter required). *SAE Combo connector: available on north-american and european EV.
IMPORTANT: Do not press the yellow button while plugging the connector
The station initiates security tests before allowing charging to start. Once the green START button flashes, press on that button. Then, charging will begin automatically.
When charging is finished, press the STOP button.
Remove the connector from the vehicle, wrap the cable around the cable holder and return the connector to the charging station. To unlock the CHAdeMO connector, press the yellow button.
Stations and pricing
Only all-electric vehicles with a CHAdeMO or Combo socket can be charged at 100 kW fast-charge station.